Construction Lifts
 
 
 
The installation can be done in different phase like For a Ground + 24 Upper Floors project can be divided into 3 or 4 phase of 6 to 7 floors each.
 
In shaft on the landing side we can provide half wooden doors for extra, these door are normally 4 feet's in heights with manual locking system. In pit Buffer spring are provided. Limiting switch on both top and bottom are provided to avoid over travel on both sides. The control panel is mounted on the floor where the machine is proved. It is in a complete shock proof enclosure.
 